Common engineering methods and control of TBM break-in and break-out operations
DOI:
https://doi.org/10.24425/ace.2026.1418Abstract
Break-in and break-out operations represent critical construction phases in shield tunnelling, particularly in water-bearing and heterogeneous ground conditions. During these transitions, temporary modifications in confinement and hydraulic boundary conditions disturb the equilibrium between face support pressure and in-situ stresses, increasing the risk of ground instability and groundwater inflow. The paper discusses the mechanical behaviour of the ground during TBM breakthrough through diaphragm walls and station boxes, with emphasis on operational pressure control, annular gap sealing and monitoring requirements. Selected engineering solutions applied to mitigate breakthrough risks are presented, including sealing rings, cement concrete blocks and ground improvement techniques. Their structural configuration, operational role and limitations are analysed in relation to groundwater pressure and soil permeability. Practical implementation is illustrated through case studies from metro projects, including the FGC Terrassa extension and Sofia Metro Line 3, where combined mechanical and geotechnical measures were adopted to ensure safe TBM transition under low cover and high groundwater conditions. The presented examples confirm that successful breakthrough operations require integrated design combining structural solutions, ground treatment and strict operational control. Break-in and break-out should therefore be treated as governing design stages in tunnel portal engineering rather than routine construction steps.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Archives of Civil Engineering

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
English
Język Polski