Relocation of a historic building at the old Norblin Factory in Warsaw

Authors

DOI:

https://doi.org/10.24425/ace.2021.136460

Abstract

The present article relates to the subject of the relocation of buildings. It presents a historical background of operations of this type carried out in the past around the world, as well as in Poland. It goes on to discuss in more detail some pioneering structural and technological solutions used during the relocation of the Rogatka Grochowska (Grochowska tollgate) building, carried out in 1961 in Warsaw. The article’s main theme is the process of relocation of a historic building No. 15 within the old Norblin Factory in Warsaw, which took place during the final months of 2018. The article briefly presents the factory’s history. It also describes the assumptions of the related project, which covers the development of the old Norblin Factory. It discusses in detail the concept and the scope of the relocation of building No. 15, with the description of the structural and technical design related to this process. The progress of the relocation which took place in 2018 has been reported in detail.

References

1. H. Glavaš, H., M. Hadzima-Nyarko, I. Haničar Buljan, T. Barić, “Locating hidden elements in walls of cultural heritage buildings by using infrared thermography”, Buildings 9: 32, 2009.

2. E. Hera, “Przesuwanie budynków na nowe fundamenty”, Rozdział 12 w książce „Fundamentowanie", tom 2, Arkady, Warszawa 1988.

3. Hojarczyk S., “Przesunięcie Kościoła przy poszerzaniu Trasy W-Z w Warszawie”, praca zbiorowa, Rada Główna Społecznego Funduszu Odbudowy Kraju i Stolicy oraz Prezydium Rady Narodowej w m. st. Warszawie, Warszawa 1965.

4. J. Hoła, J. Bień, Ł. Sadowski, K. Schabowicz, “Non-destructive and semi-destructive diagnostics of concrete structures in assessment of their durability”, Bulletin of the Polish Academy of Sciences Technical Sciences 63: 87-96, 2015.

5. J. Hoła, “Degradacja budynków zabytkowych wskutek nadmiernego zawilgocenia - wybrane problemy”, Budownictwo i Architektura 17: 133-148, 2018.

6. A. Hoła, Ł. Sadowski, “A method of the neural identification of the moisture content in brick walls of historic buildings on the basis of non-destructive tests”, Automation in Construction 106: 102850, 2019.

7. J. Kobiak, “Przesunięcie kościoła przy Alei gen. Świerczewskiego w Warszawie”, Inżynieria i Budownictwo 2, 1963.

8. Z. Kotarski, “Przesunięcie rogatki grochowskiej w Warszawie”, Inżynieria i Budownictwo 10, 1961.

9. Z. Kotarski, M. Kozioł, “Ocena koncepcji, realizacji i wyników badań przesunięcia Kościoła przy Alei gen. Świerczewskiego w Warszawie”, Inżynieria i Budownictwo 2, 1964.

10. J. Z. Lenard, “Przesuwanie budynków zabytkowych w Warszawie: Rogatka Grochowska, kościół p. w. Nawiedzenia N. M. P. na Lesznie”, Ochrona Zabytków 16: 13-29, 1963.

11. F. Markuszewski, “Obrót pałacu Lubomirskich w Warszawie”, Konstrukcje Metalowe, Biuletyn Branżowy Zjednoczenia Mostostal 4/25 Warszawa, 1970.

12. Z. Wiesławski, “Przesunięcie zabytkowego budynku Rogatki Grochowskiej w Warszawie”, Konstrukcje Stalowe 2, 2002.

13. J. Ziółko, “Przesunięcie (w 1967 r.) wartowni nr 1 na Westerplatte w Gdańsku”, Inżynieria i Budownictwo 10: 545-548, 2009.

14. W. Żenczykowski, “O przesuwaniu wielkich ciężarów i budynków”, Przegląd Budowlany 11, 1951.

15. https://www.twoja-praga.pl/info/informacje/3668.html

16. http://wawtech.pl/warszawski-szlak-techniki/norblin/

17. http://fabrykanorblina.pl

18. https://www.skyscrapercity.com

Downloads

Published

2021-03-30

How to Cite

Kossakowski, Paweł, Grzegorz. “Relocation of a Historic Building at the Old Norblin Factory in Warsaw”. Archives of Civil Engineering, vol. 67, no. 1, Mar. 2021, pp. 39-55, doi:10.24425/ace.2021.136460.

Issue

Section

Articles

Similar Articles

<< < 35 36 37 38 39 40 41 42 43 44 > >> 

You may also start an advanced similarity search for this article.