Decision making in choosing a network organizational structure in integrated construction projects

Authors

DOI:

https://doi.org/10.24425/ace.2021.137163

Abstract

Recent research has shown that the increase in a number of participants of construction project elevated the cost and duration of construction. The use of integrated project delivery and the formation of a network organization structure can significantly reduce the costs, as the activities of the participants become more coherent and coordinated. The optimization of decisions is essential for the efficiency of a negotiation process, which in turn depends on the organizational structure. The article specifies three basic types of network organizational structure that can be applied in a construction project: focal (F1), dynamic (F2), multifocal (F3). In this study, a direct assessment of possible effectiveness of each of the three types of network organizational structures was carried out using a vector decision model. For each of the above-mentioned types of organizational structures, the potential effectiveness of negotiating act f0 and the total potential effectiveness F0 was calculated. The results of the study show that the most effective type of network organizational structure is the multifocal collective decisions in which a project manager has several “assistants”.

References

[1] M. Rogalska, Z. Hejducki, “The application of time coupling methods in the engineering of construction projects”, Czasopismo Techniczne, 9: 67-74, 2017.

[2] T. Kasprowicz, R. Wójcik, „Analiza identyfikacyjna niestabilnych przedsięwzięć budowlanych”, Scientific Review Engineering and Environmental Sciences, 28(2): 285-298, 2019.

[3] R. Trach, M. Polonski, P. Hrytsiuk, “Modelling of Efficiency Evaluation of Traditional Project Delivery Methods and Integrated Project Delivery (IPD)”, IOP Conf. Series: Materials Science and Engineering 471, 2019. [accessed 2019 Sep 30]. https://iopscience.iop.org/article/10.1088/1757-899X/471/11/112043.

[4] A. Malisiovas, X. Song, “Social Network Analysis (SNA) for Construction Projects' Team Communication Structure Optimization”, Construction research congress 2014: Construction in a global network, 2014.

[5] H.A. Mesa, K.R. Molenaar, L.F. Alarcon, “Exploring performance of the integrated project delivery process on complex building projects”, International Journal of Project Management. 34:1089-1101, 2016.

[6] Project Management Institute, “PMI. A Guide to the Project Management Body of Knowledge (PMBOK Guide)”, Edition 2000., Inc. Newtown Square, Pennsylvania, USA, 2000.

[7] O. Kapliński, “Innovative solutions in construction industry. Review of 2016-2018 events and trends”, Engineering Structures and Technologies 10.1: 27-33, 2018.

[8] E. Zavadskas, Z. Turskis, J. Tamošaitiene, “Risk assessment of construction projects”, Journal of Civil Engineering and Management, 16: 33-46, 2010.

[9] R. Trach, M. Lendo-Siwicka, “Network organizational structure application in integrated project delivery”, Scientific Review-Engineering and Environmental Sciences, 27 (1), 82-90, 2018.

[10] L.S. Forbes, S.M. Ahmed, “Modern Construction: Lean Project Delivery & Integrated Practices”, Taylor & Francis, 2010.

[11] N. Azhar, “Integrated Construction Project Delivery System in the U.S. Public Sector: An Information Modeling Framework”, FIU Electronic Theses and Dissertations. 1567. [accessed 2019 Oct 18]. http://digitalcommons.fiu.edu/etd/1567.

[12] R. Trach, M. Lendo-Siwicka, K. Pawluk, N. Bilous, “Assessment the effect of the integration realisation in construction projects”, Technical Journal.13(3): 254-259, 2019.

[13] O. Hlaoittinun, E. Bonjour, M. Dulmet, “A multidisciplinary team building method based on competency modelling in design project management”, International Journal of Management Science and Engineering Management. 3(3): 163-175, 2008.

[14] T. Deng, X. Zhou, “Risk correlation analysis for China’s construction projects based on stakeholder theory”, International Journal of Management Science and Engineering Management. 5(4): 285-292, 2010.

[15] M.I. Mohamad, R. Ibrahim, M.A. Nekooie, “A new method for evaluating the current collaborative teamwork environment within the Malaysian construction industry”, International Journal of Management Science and Engineering Management. 9(4): 265-275, 2014.

[16] Y. Teng, X. Li, P. Wu, X. Wang, “Using cooperative game theory to determine profit distribution in IPD projects”, International Journal of Construction Management. 19:32-45, 2019.

[17] M. Loosemore, “Social network analysis: using a quantitative tool within an interpretative context to explore the management of construction crises”, Engineering, construction and architectural management. 5.4: 315-326, 1998.

[18] S. Pryke, “Social Network Analysis in Construction”, 1st edn., Oxford: Wiley and Sons, 2012.

[19] F. Madani, T. Daim, C. Weng, “Smart building technology network analysis: applying core-periphery structure analysis”, International Journal of Management Science and Engineering Management.12(1): 1-11, 2017.

[20] A. Abbsaian-Hosseini S, M. Liu, S.M. Hsiang, “Social network analysis for construction crews”, International Journal of Construction Management. 19(2): 1-15, 2017.

[21] P. Chinowsky, A. Songer, “Organizational management in construction”, New York: Spon Press, 2011.

[22] S. Pryke, “Managing networks in project-based organisations”, John Wiley & Sons, 2017.

[23] A. El Sheikh, S. Pryke, “Network gaps and project success”, Construction Management and Economics. 28.12: 1205-1217, 2010.

[24] R. Ximing et al., “Knowledge integration process in construction projects: a social network analysis approach to compare competitive and collaborative working”, Construction Management and Economics. 30.1: 5-19, 2012.

[25] F. Heylighen, “Self-organization in communicating groups: The emergence of coordination, shared references and collective intelligence” In Massip-Bonet, À., and Bastardas-Boada, A. (Eds.), Complexity perspectives on language, communication, and society, Berlin Heidelberg, Germany: Springer-Verlag, 117-149, 2013.

[26] S. Pryke et al., “Self-organizing networks in complex infrastructure projects”, Project management journal 49.2: 18-41, 2018.

[27] G. Śladowski, E. Radziszewska-Zielina, E. Kania, “Analysis of self-organising networks of communication between the participants of a housing complex construction project”, Archives of Civil Engineering 65.1: 181-195, 2019.

[28] E. Radziszewska-Zielina et al., “Managing Information Flow in Self-Organising Networks of Communication Between Construction Project Participants”, Archives of Civil Engineering 65.2: 133-148, 2019.

[29] Y. Mashunin, “Teoreticheskiye osnovy i metody vektornoy optimizatsii v upravlenii ekonomicheskimi systemami [Theoretical bases and methods of vector optimization in the management of economic systems]”, Moskow, Logos, 2001. Russian.

[30] P.F. Bonacich, “Power and centrality: A family of measures”, American Journal of Sociology 92, 1170-1182, 1987.

Downloads

Published

2021-06-30

How to Cite

Trach, Roman, et al. “Decision Making in Choosing a Network Organizational Structure in Integrated Construction Projects”. Archives of Civil Engineering, vol. 67, no. 2, June 2021, pp. 195-08, doi:10.24425/ace.2021.137163.

Issue

Section

Articles

Similar Articles

<< < 16 17 18 19 20 21 22 23 24 25 > >> 

You may also start an advanced similarity search for this article.