Randomized Earned Value Method for the rolling assessment of construction projects advancement

Authors

DOI:

https://doi.org/10.24425/ace.2022.140655

Abstract

The Randomized Earned Value Method enable to control the time and cost of works during the implementation of a construction project. The method allows to assess the compliance of the current advancement in time and actually incurred costs with the adopted plan. It also allows to predict the date and amount of the project completion costs. Individual assessment indicators (BCWS, BCWP, ACWP) are calculated after the ongoing control of the progression of works. In the case of randomly changing of implementation conditions, the calculated in this way values of the indicators may be unacceptable because of overlarge differences in comparison to actual values. Therefore, it is proposed an EVM enhancement and additional risk conditions analysis. In this approach data from the quantity survey of works are randomized based on analysis of variations between actually measured and planned values of duration and cost of implemented works. It is estimated the randomized values of individual indicators after successive controls of the progress of works. After each project advancement control the duration and cost of the works that remain to be performed are estimated. Moreover, new verified overall time and total cost of the project implementation are also estimated. After the last inspection, randomized values of the final date and total cost of completion of the project are calculated, as well as randomized values of time extension and total cost overrun. Of course, for randomized values, standard deviations of individual quantities are calculated. Therefore, the risk of time and the risk of cost of the project implementation are presented in the risk charts. The proposed approach provides a better assessment of the progress of works under risk conditions. It is worth to add that the method does not require significant changes to the typical construction management process, however, it ensures realistic consideration of the influence of random factors on the course and results of individual works and the entire project.

References

[1] F. Anbari, “Earned value method and extensions”, Project Management Journal, 2003, vol. 34, no. 4, pp. 12-23, DOI: 10.1177/875697280303400403.

[2] ANSI EIA - 748 Standard - Earned Value Management Systems.

[3] K. Athey, “EVM - Current Solution and Roadmap to Adoption”, QuantumPM, 2007. [Online]. Available: http://www.quantumpm.com.

[4] K. Araszkiewicz, M. Bochenek, “Control of construction projects using the Earned Value Method - case study”, Open Engineering, 2019, vol. 9, no. 1, pp. 186-195, DOI: 10.1515/eng-2019-0020.

[5] P. Ballesteros-Perez, E. Sanz-Ablanedo, D. Mora-Melia, et al., “Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects”, Automation in Construction, 2019, vol. 103, pp. 279-290, DOI: 10.1016/j.autcon.2019.03.016.

[6] A. Czarnigowska, “Earned value method as a tool for project control”, Architecture and Building, 2008, vol. 3, no. 2, pp. 15-32, DOI: 10.35784/bud-arch.2320.

[7] A. Czarnigowska, “Kontrola postępu realizacji przedsięwzięcia metodą Earned Value”, in Problemy przygotowania i realizacji inwestycji budowlanych, Warsztaty Inżynierów Budownictwa. Puławy: Wydawnictwo Wacetob, 2008, pp. 101-108.

[8] A. Czarnigowska, P. Jaśkowski, S. Biruk, “Project performance reporting and prediction: extensions of Earned value management”, International Journal of Business and Management, 2011, vol. 3, pp. 11-20.

[9] A. Czarnigowska, A. Sobotka, “Metoda planowania i kontrolowania realizacji przedsięwzięć budowlanych: stadium przypadku”, Górnictwo i Geoinżynieria, 2011, vol. 35, no. 1, pp. 17-56.

[10] P.A. de Andrade, A. Martens, M. Vanhoucke, “Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities”, Automation in Construction, 2019, vol. 99, pp. 68-78, DOI: 10.1016/j.autcon.2018.11.030.

[11] U. Dwivedi, “Earned Value Management Explained”, 2019 Project Smart reserved. [Online]. Available: https://www.projectsmart.co.uk/earned-value-management-explained.php.

[12] F. Elghaish, S. Abrishami, M. Reza Hosseini, S. Abu-Samra, M. Gaterell, “Integrated project delivery with BIM: An automated EVM-based approach”, Automation in Construction, 2019, vol. 106, DOI: 10.1016/j.autcon.2019.102907.

[13] EVM earned value management. [Online]. Available: https://www.tutorialspoint.com/.

[14] T. Kasprowicz, “Quantitative assessment of construction risk”, Archives of Civil Engineering, 2017, vol. 63, no. 2, pp. 55-66, DOI: 10.1515/ace-2017-0016.

[15] T. Kasprowicz, “Quantitative identification of construction risk”, Archives of Civil Engineering, 2017, vol. 63, no. 1, pp. 63-75, DOI: 10.1515/ace-2017-0005.

[16] A. Miguel, W. Madria, R. Polancos, “Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management", in 2019 IEEE 6th International Conference on Industrial Engineering and Applications (ICIEA), Tokyo, Japan. 2019, pp. 622-628.

[17] N. Moradi, S.M. Mousavi, B. Vandani, “An earned value model with risk analysis for project management under uncertain conditions”, Journal of Intelligent & Fuzzy Systems, 2017, vol. 32, no. 1, pp. 97-113, DOI: 10.3233/JIFS-151139.

[18] A. Mubarak Saleh, Construction Project Scheduling and Control. John Wiley & Sons, 2015. ISBN: 978-1-118-84600-1, pp. 504.

[19] M. Połoński, “Wpływ aneksowania terminu umowy na prognozę kosztu realizacji w metodzie wartości wypracowanej”, Acta Scientiarum Polonorum. Architectura, 2019, vol. 18, no. 2, pp. 69-78, DOI: 10.22630/ASPA.2019.18.2.24.

[20] M. Połoński, “Kontrola kosztów budowy metoda EVM jako metoda ograniczenia ryzyka przekroczenia planowanego budżetu”, Przegląd Budowlany, 2010, no. 10, pp. 46-52.

[21] M. Połoński, “Prognozowanie czasu zakończenia inwestycji na podstawie jej bieżącego zaawansowania”, Metody ilościowe w badaniach ekonomicznych, 2012, vol. 13, no. 3, pp. 169-179.

[22] M. Połoński, P. Komendarek, “Bieżąca kontrola kosztów realizacji obiektu budowlanego metoda earned value”, Metody ilościowe w badaniach ekonomicznych, 2011, vol. 12, no. 2, pp. 279-290.

[23] M. Połoński, “Zależność kontyngencji czasu i kosztu w harmonogramach budowlanych”, Czasopismo Inżynierii Ladowej, Środowiska I Architektury, Journal of Civil Engineering, Environment and Architecture JCEEA, 2016, vol. 33, no. 63(1/I), pp. 197-204, DOI: 10.7862/rb.2016.23.

[24] B. Roseke, “The Earned Value Method”. [Online]. Available: https://www.projectengineer.net/the-earnedvalue-method/. [Accessed: 19 April, 2018].

[25] L. Song, Earned Value Management: A Global Cross-Industry Perspective on Current EVM Practice. PMI, 2010.

[26] A. Starczyk-Kołbyk, L. Kruszka, “The influence of construction works disturbances on the EVM analysis outcomes - case study”, Archives of Civil Engineering, 2020, vol. 66, no. 1, pp. 161-177, DOI: 10.24425/ace.2020.131781.

[27] A. Starczyk-Kołbyk, L. Kruszka, “Use of the EVM method for analysis of extending the construction project duration as a result of realization disturbances - case study”, Archives of Civil Engineering, 2021, vol. 67, no. 3, pp. 373-393, DOI: 10.24425/ace.2021.138061.

[28] A. Webb, Using Earned Value - a project manager guide. Gower Publishing, Ltd., 2003.

Downloads

Published

2022-06-30

How to Cite

Kasprowicz, Tadeusz, and Anna Starczyk-Kołbyk. “Randomized Earned Value Method for the Rolling Assessment of Construction Projects Advancement”. Archives of Civil Engineering, vol. 68, no. 2, June 2022, pp. 501-20, doi:10.24425/ace.2022.140655.

Issue

Section

Articles

Similar Articles

<< < 32 33 34 35 36 37 38 39 40 41 > >> 

You may also start an advanced similarity search for this article.