Abstract

The demands placed on industry today are increasingly challenging and demanding. To meet these challenges, designers, contractors, and technology managers are constantly looking for effective solutions. Industry has always thrived on new technologies and innovations to achieve better results, so it is critical to undertake new developmental research to simulate and test new technological proposals. In this paper, the author describes a new direction in civil engineering technology that interdisciplinary couples solutions known to the bridge industry with geotechnical aspects in the technology space and the possibility of implementation in the construction industry. The author proposes the application of prestressing together with technological aspects of this solution to diaphragm walls, which are not only a temporary housing but also the foundations of a new investment. Thanks to this solution it is possible, among other things, to resign from one level of diaphragm expansion of diaphragm walls, which translates into cost optimization. It is an innovative approach to designing and most of all constructing the load-bearing structure, which directly influences the technological optimization of selected issues of completing the underground parts of the investment. Additionally, the presented solution contributes to the balanced execution of the investment by reducing the use of materials and construction equipment. The author discusses technological, execution and implementation problems related to the application of innovative solutions in construction companies together with examples of cost optimization. The author presents the results of conducted research with application of the proposed solution in the implementation of the underground commercial investment.

References

[1] POL-on. [Online]. Available: https://polon.nauka.gov.pl/opi/aa/pn?execution=e1s1. [Accessed: 14.04. 2022].

[2] Y. Xie, Y. Zhao, Y. Chen, and C. Allen, “Green construction supply chain management: Integrating governmental intervention and public-private partnerships through ecological modernisation”, Journal of Cleaner Production, vol. 331, art. no. 129986, 2022, DOI: 10.1016/j.jclepro.2021.129986.

[3] Centrum Informacji o Rynku Energii (CIRE.PL). [Online]. Available: https://www.cire.pl/artykuly/opinie/174126-zastosowanie-nowoczesnych-rozwiazan-w-przedsiebiorstwie-i-ich-wplyw-na-ograniczenie-sladu-weglowego. [Accessed: 21.04.2022].

[4] F. Pomponi and A. Stephan, “Water, energy, and carbon dioxide footprints of the construction sector: A case study on developed and developing economies”, Water Research, vol. 194, art. no. 116935, 2021, DOI: 10.1016/j.watres.2021.116935.

[5] W. Jackiewicz-Rek, K. Chilmon, and A. Garbacz, “Beton fotokataliczny nowej generacji - wyzwania naukowe i koncepcje wdrożeniowe”, Inżynieria i Budownictwo, vol. 77, no. 1/2, pp. 55-59, 2021.

[6] B. Heidari and L. C. Marr, “Real-time emissions from construction equipment compared with model predictions”, Journal of the Air & Waste Management Association, vol. 65, no. 2, pp. 115-125, 2015, DOI: 10.1080/10962247.2014.978485.

[7] J. Kulejewski, N. Ibadov, J. Rosłon, and J. Zawistowski, “Cash Flow Optimization for Renewable Energy Construction Projects with a New Approach to Critical Chain Scheduling”, Energies, vol. 14, no. 18, art. no. 5795, 2021, DOI: 10.3390/en14185795.

[8] J. Rosłon, M. Książek-Nowak, and P. Nowak, “Schedules Optimization with the Use of Value Engineering and NPV Maximization”, Sustainability, vol. 12, no. 18, pp. 1-21, 2020, DOI: 10.3390/su12187454.

[9] J. Sobieraj, D. Metelski, and P. Nowak, “The view of construction companies’ managers on the impact of economic, environmental and legal policies on investment process management”, Archives of Civil Engineering, vol. 67, no. 1, pp. 111-129, 2021, DOI: 10.24425/ace.2021.136464.

[10] Q. Weng, Z. Xu, Z. Wu, and R. Liu, “Design and Performance of the Deep Excavation of a Substation Constructed by top-down Method in Shanghai Soft Soils”, Procedia Engineering, vol. 165, pp. 682-694, 2016, DOI: 10.1016/j.proeng.2016.11.766.

[11] Zarząd Dróg i Zieleni w Gdyni. [Online]. Available: https://www.zdiz.gdynia.pl/sprawydozalatwienia/wydawanie-zezwolen-na-zajecie-pasa-drogowego/. [Accessed: 29.04.2022].

[12] K. Bode, A. Różycka, and P. Nowak, “Development of a Pragmatic IT Concept for a Construction Company”, Sustainability, vol. 12, no. 17, pp. 1-17, 2020, DOI: 10.3390/su12177142.

[13] H. Tajima, M. Kishida, N. Fukai, A. Dan, and M. Saito, “Study on construction loads during shield tunneling using a three-dimensional FEM model”, Tunnelling and Underground Space Technology, vol. 21, no. 3-4, pp. 250-250, 2006, DOI: 10.1016/j.tust.2005.12.112.

[14] NSCC International. [Online]. Available: https://nsccme.com/projects/kahramaa-new-hq-tower-lusail-doha/. [Accessed: 05.09.2022].

[15] T. Kasprowicz and A. Starczyk-Kołbyk, “Randomized Earned Value Method for the rolling assessment of construction projects advancement”, Archives of Civil Engineering, vol. 68, no. 2, pp. 501-520, 2022, DOI: 10.24425/ace.2022.140655.

[16] P. Nowak, M. Książek, M. Draps, and J. Zawistowski, “Decision Making with Use of Building Information Modeling”, Procedia Engineering, vol. 153, pp. 519-526, 2016, DOI: 10.1016/j.proeng.2016.08.177.

[17] R. Sukkarak, S. Likitlersuang, P. Jongpradist, and P. Jamsawang, “Strength and stiffness parameters for hardening soil model of rockfill materials”, Soils and Foundations, vol. 61, no. 6, pp. 1597-1614, 2021, DOI: 10.1016/j.sandf.2021.09.007.

[18] R. de Borst, “Chapter 6 - Fracture Modeling Using Isogeometric Analysis”, in Computational Methods for Fracture in Porous Media, R. de Borst. Elsevier, 2018, pp. 109-154, DOI: 10.1016/B978-0-08-100917-8.00006-X.

[19] P. Nowak and M. Skłodkowski, “Multicriteria Analysis of Selected Building Thermal Insulation Solutions”, Archives of Civil Engineering, vol. 62, no. 3, pp. 137-148, 2016, DOI: 10.1515/ace-2015-0088.

[20] M. Szóstak, “Proactive scheduling of repetitive construction processes to reduce crews idle times and delays”, Archives of Civil Engineering, vol. 67, no. 4, pp. 243-259, 2021, DOI: 10.24425/ace.2021.138497.

[21] J. Martí, F. Gonzalez-Vidosa, V. Yepes, and J. Alcalá, “Design of prestressed concrete precast road bridges with hybrid simulated annealing”, Engineering Structures, vol. 48, pp. 342-352, 2013, DOI: 10.1016/j.engstruct.2012.09.014.

[22] M. Alqedra, M. Arafa, and M. Ismail, “Optimum Cost of Prestressed and Reinforced Concrete Beams using Genetic Algorithms”, Journal of Artificial Intelligence, vol. 4, no. 1, pp. 76-88, 2011, DOI: 10.3923/jai.2011.76.88.

[23] B. Supriyadi, S. Siswosukarto, and A. Triwiyono. “Economic review of variation of prestressed girder length on bridge construction practices”, International Journal of GEOMATE, vol. 19, no. 76, pp. 165-172, 2022, DOI: 10.21660/2020.76.83951.

Downloads

Published

2023-03-30

How to Cite

Frydrych, Mateusz. “Optimization of Innovative Design Solutions in Geotechnical Engineering”. Archives of Civil Engineering, vol. 69, no. 1, Mar. 2023, pp. 329-42, doi:10.24425/ace.2023.144176.

Issue

Section

Articles

Similar Articles

<< < 41 42 43 44 45 46 47 48 49 50 > >> 

You may also start an advanced similarity search for this article.