Scheduling with the Probabilistic Coupling Method I (PTCM I) - assuming the continuity of work of working teams

Authors

DOI:

https://doi.org/10.24425/ace.2023.145278

Abstract

Modeling and numerical analysis of the design of building structures, their technology, organization and management methods of construction processes are the subject of the work of many scientists in Poland. Schedule designers try to best reflect the reality of construction projects with the available methods, although this procedure is not always successful. One of the scheduling methods is the Time Coupling Methods (TCM), which can be refined using the predictive durations of the Multivariate Method of Statistical Models (MMSM) construction processes and standard deviations. A new scheduling method in the probabilistic approach was developed - Probabilistic Time Couplings Method I (PTCM I). At PTCM I, work is organized in such a way as to maintain the continuity of work of employees, as downtime of workers is disadvantageous and costly. The total duration of the new investment was forecasted and compared with the other methods of scheduling and with real time after its completion. The results clearly show that the developed methodology can be successfully used in scheduling construction works.

References

[1] S.A. Assaf and S. Al-Hejji, “Causes of delay in large construction projects”, International Journal of Project Management, vol. 24, no. 4, pp. 349-357, 2006, doi: 10.1016/j.ijproman.2005.11.010.

[2] I. Mahamid, A. Bruland, and N. Dmaidi, “Causes of delay in road construction projects”, Journal of Management in Engineering. vol. 28, no. 3, pp. 300-310, 2012, doi: 10.1061/(ASCE)ME.1943-5479.0000096.

[3] F.D. Fugar and A.B. Agyakwah-Baah, “Delays in building construction projects in Ghana”, Australasian Journal of Construction Economics and Building, vol. 10, no. 1-2, pp. 103-116, 2010, doi: 10.5130/AJCEB.v10i1-2.1592.

[4] R.F. Aziz, “Ranking of delay factors in construction projects after Egyptian revolution”, Alexandria Engineering Journal, vol. 52, no. 3, pp. 387-406, 2013, doi: 10.1016/j.aej.2013.03.002.

[5] W. Jing, H.I. Naji, R.N. Zehawi, Z. Ali, N. Al-Ansari, and Z.M. Yaseen, “System dynamics modeling strategy for civil construction projects: the concept of successive legislation periods”, Symmetry, vol. 11, no. 5, art. no. 677, 2019, doi: 10.3390/sym11050677.

[6] A. Gondia, A. Siam, W. El-Dakhakhni, and A.H. Nassar, “Machine learning algorithms for construction projects delay risk prediction”, Journal of Construction Engineering and Management, vol. 146, no. 1, 2020, doi: 10.1061/(ASCE)CO.1943-7862.0001736.

[7] N. Kokkaew and W. Wipulanusat, “Completion delay risk management: A dynamic risk insurance approach”, KSCE Journal of Civil Engineering, vol. 18, pp. 1599-1608, 2014, doi: 10.1007/s12205-014-1128-4.

[8] C. Rhodes, Construction industry: statistics and policy. House of Commons Library, no. 01432, 2019, pp. 1-13. [Online]. Available: https://researchbriefings.files.parliament.uk/documents/SN01432/SN01432.pdf.

[9] B. Flyvbjerg, “What you should know about megaprojects and why: An overview”, Project Management Journal, vol. 45, no. 2, pp. 6-19, 2014, doi: 10.1002/pmj.21409.

[10] Y. Liang and H. Wang, “Sustainable performance measurements for public-private partnership projects: empirical evidence from China”, Sustainability, vol. 11, no. 13, art. no. 3653, 2019, doi: 10.3390/su11133653.

[11] X. Jiang, K. Lu, B. Xia, Y. Liu, and C. Cui, “Identifying significant risks and analyzing risk relationship for construction PPP projects in China using integrated FISM-MICMAC approach”, Sustainability, vol. 11, no. 19, art. no. 5206, 2019, doi: 10.3390/su11195206.

[12] Y. Li and X.Y. Wang, “Using fuzzy analytic network process and ISM methods for risk assessment of public-private partnership: A China perspective”, Journal of Civil Engineering and Management, vol. 25, no. 2, pp. 168-183, 2019, doi: 10.3846/jcem.2019.8655.

[13] B.K. Sovacool, A. Gilbert, and D. Nugent, “An international comparative assessment of construction cost overruns for electricity infrastructure”, Energy Research and Social Science, vol. 3, pp. 152-160, 2014, doi: 10.1016/j.erss.2014.07.016.

[14] O. Awojobi and G.P. Jenkins, “Were the hydro dams financed by the World Bank from 1976 to 2005 worthwhile?”, Energy Policy, vol. 86, pp. 222-232, 2015, doi: 10.1016/J.ENPOL.2015.06.040.

[15] A. Ansar, B. Flyvbjerg, A. Budzier, and D. Lunn, “Should we build more large dams? The actual costs of hydropower megaproject development”, Energy Policy, vol. 69, pp. 43-56, 2014, doi: 10.1016/j.enpol.2013.10.069.

[16] J.R.S. Cristóbal, “The S-curve envelope as a tool for monitoring and control of projects”, Procedia Computer Science, vol. 121, pp. 756-761, 2017, doi: 10.1016/j.procs.2017.11.097.

[17] R. Atkinson, “Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria”, International Journal of Project Management, vol. 17, no. 6, pp. 337-342, 1999, doi: 10.1016/S0263-7863(98)00069-6.

[18] M. Rogalska, Wieloczynnikowe modele w prognozowaniu czasu procesów budowlanych. Lublin: Monografie Politechniki Lubelskiej, 2016.

[19] P. Kostrzewa-Demczuk and M. Rogalska, “Anticipating the length of employees’ working time”, Symmetry, vol. 12, no. 3, art. no. 413, 2020, doi: 10.3390/sym12030413.

[20] P. Kostrzewa and M. Rogalska, “Scheduling construction processes using the probabilistic time coupling method III”, in IOP Conference Series: Materials Science and Engineering, vol. 471, no. 11, art. no. 11207, 2019, doi: 10.1088/1757-899X/471/11/112072.

[21] S. Bolotin, A. Dadar, M. Rogalska, and Z. Hejducki, “Harmonogramowanie przedsięwzięć budowlanych z uwzględnieniem modelu czasowo przestrzennego”, Przegląd Budowlany, no. 11, pp. 24-28, 2014.

[22] R.M. Choudhry, M.A. Aslam, J. Hinze, and F.M. Arain, “Cost and schedule risk analysis of bridge construction in Pakistan: establishing risk guidelines”, Journal of Construction Engineering and Management, vol. 140, no. 7, 2014, doi: 10.1061/(ASCE)CO.1943-7862.0000857.

[23] PMI, A Guide to the Project Management Body of Knowledge. Project Management Institute (PMI), 2017.

[24] J.C. Teixeria, J. Kulejewski, M. Krzemiński, and J. Zawistowski, Zarządzanie ryzykiem w budownictwie. Warszawa: Guimaraes, 2011.

[25] PMBOK Guide. A Guide to the Project Management Body of Knowledge. Pennsylvania, USA: Project Management Institute (PMI), 2000.

[26] M. Vanhoucke, “Schedule risk analysis”, in Project Management with Dynamic Scheduling. Springer, 2013, pp. 81-100, doi: 10.1007/978-3-642-40438-2_5.

[27] S. Sackey and B.-S. Kim, “Schedule risk analysis using a proposed modified variance and mean of the original program evaluation and review technique model”, KSCE Journal of Civil Engineering, vol. 23, pp. 1484-1492, 2019, doi: 10.1007/s12205-019-1826-z.

[28] D. Nasir, B. Mccabe, and L. Hartono, “Evaluating risk in construction-schedule model (ERIC-S): construction schedule risk model”, Journal of Construction Engineering and Management, vol. 129, no. 5, pp. 518-527, 2003, doi: 10.1061/(ASCE)0733-9364(2003)129:5(518).

[29] Ö. Ökmen and O. Öztas, “Construction project network evaluation with correlated schedule risk analysis model”, Journal of Construction Engineering and Management, vol. 134, no. 1, pp. 49-63, 2008, doi: 10.1061/(ASCE)0733-9364(2008)134:1(49).

[30] Z. M. Yaseen, et al., “Prediction of risk delay in construction projects using a hybrid artificial intelligence model”, Sustainability, vol. 12, no. 4, art. no. 1514, 2020, doi: 10.3390/su12041514.

[31] T.S. Glickman and F. Xu, “The distribution of the product of two triangular random variables”, Statistics and Probability Letters, vol. 78, pp. 2821-2826, 2008.

[32] K.E. Fairchild, L. Misra, and Y. Shi, “Using triangular distribution for business and finance simulations in Excel”, Journal of Financial Education, vol. 42, pp. 313-336, 2016.

[33] D. Johnson, “Triangular approximations for continuous random variables in risk analysis”, Journal of the Operational Research Society, vol. 53, no. 4, pp. 457-467, 2002, doi: 10.1057/palgrave.jors.2601330.

[34] P. Kostrzewa-Demczuk, “Scheduling with TCM methods in the probabilistic approach”, PhD thesis, Kielce University of Technology, Poland, 2022.

[35] I.T. Yang, “Impact of budget uncertainty on project time-cost tradeoff”, IEEE Transactions on Engineering Management, vol. 52, no. 2, pp. 167-174, 2005, doi: 10.1109/TEM.2005.844924.

Downloads

Published

2023-06-30

How to Cite

Kostrzewa-Demczuk, Paulina, and Magdalena Rogalska. “Scheduling With the Probabilistic Coupling Method I (PTCM I) - Assuming the Continuity of Work of Working Teams”. Archives of Civil Engineering, vol. 69, no. 2, June 2023, pp. 455-69, doi:10.24425/ace.2023.145278.

Issue

Section

Articles

Similar Articles

<< < 50 51 52 53 54 55 56 57 58 59 > >> 

You may also start an advanced similarity search for this article.