Parameter analysis of a cable-stayed bridge without backstays

Authors

DOI:

https://doi.org/10.24425/ace.2025.154141

Abstract

A cable-stayed bridge without backstays is an important branch of the cable-stayed bridge family. It tilts the bridge tower to one side and removes the backstay cable, relying on its own weight to balance the tension in the slanted cables. It has the characteristics of novel structure and beautiful appearance and is highly favored in the construction of urban areas both domestically and internationally. This paper, based on the main bridge construction project of the Jinzhou Bridge, uses finite element analysis software to establish a spatial model and simulate the construction process, focusing on parameter analysis and the effect of bridge tower tilt angle. The paper analyzes the impact of changes in parameters such as structural stiffness and tension on the structure in the completed bridge state, and concludes that the sensitivity parameters affecting the deformation and internal force of the bridge are tension, temperature, and shrinkage creep, while the insensitivity parameter is structural stiffness. The force state of the cable-stayed bridge without backstays is closely related to the tilt angle of the tower. By changing the tower’s tilt angle, the paper studies the changes in the structural forces and the impact of the tower tilt angle on the structural performance and bridge cost.

References

[1] H. Hao and E.K.C. Tang, “Numerical simulation of a cable-stayed bridge response to blast loads, Part II: Damage prediction and FRP strengthening”, Engineering Structures, vol. 32, no. 10, pp. 3193-3205, 2010, doi: 10.1016/j.engstruct.2010.06.006.

[2] X. Zheng and Y. Cui, “Analysis of static performance of cable-stayed arch cooperative bridge without back cable”, Archives of Civil Engineering, vol. 62, no. 2, 2022, doi: 10.24425/ace.2022.140657.

[3] X. Shao, H. Zhao, and L. Li, “Design and experimental study of a harp-shaped single span cable-stayed bridge”, Journal of Bridge Engineering, vol. 10, no. 6, pp. 658-665, 2005, doi: 10.1061/(ASCE)1084-0702(2005)10:6(658).

[4] T.C. Huynh, J.H. Park, and J.T. Kim, “Structural identification of cable-stayed bridge under back-to-back typhoons by wireless vibration monitoring”, Measurement, vol. 88, pp. 385-401, 2016, doi: 10.1016/j.measurement.2016.03.032.

[5] Q. Han, J. Wen, X. Du, et al., “Nonlinear seismic response of a base isolated single pylon cable-stayed bridge”, Engineering Structures, vol. 175, pp. 806-821, 2018, doi: 10.1016/j.engstruct.2018.08.077.

[6] F. Casciati, G.P. Cimellaro, and M. Domaneschi, “Seismic reliability of a cable-stayed bridge retrofitted with hysteretic devices”, Computers and Structures, vol. 86, no. 17-18, pp. 1769-1781, 2008, doi: 10.1016/j.compstruc.2008.01.012.

[7] Y. Zhang, Z. Fang, R. Jiang, et al., “Static performance of a long-span concrete cable-stayed bridge subjected to multiple-cable loss during construction”, Journal of Bridge Engineering, vol. 25, no. 3, 2020, doi: 10.1061/(ASCE)BE.1943-5592.0001529.

[8] H. Duan, H. Liu, Y. Sun, and H. Gao, “Determination of reasonable internal force state for cable-stayed bridge without backstays”, Journal of Civil Structural Health Monitoring, vol. 13, pp. 1243-1263, 2023, doi: 10.1007/s13349-023-00706-4.

[9] A. Pipinato, C. Pellegrino, and C. Modena, “Structural analysis of the cantilever construction process in cable-stayed bridges”, Periodica Polytechnica. Civil Engineering, vol. 56, no. 2, pp. 1-26, 2012, doi: 10.3311/pp.ci.2012-2.02.

[10] X. Sheng, W. Zheng, Z. Zhu, et al., “Ganjiang Bridge: A high-speed railway long-span cable-stayed bridge laying ballastless tracks”, Structural Engineering International, vol. 31, no. 1, pp. 40-44, 2021, doi: 10.1080/10168664.2019.1671157.

[11] J. Farré-Checa, S. Komarizadehasl, H. Ma, et al., “Direct simulation of the tensioning process of cable-stayed bridge cantilever construction”, Automation in Construction, vol. 137, art. no. 104197, 2022, doi: 10.1016/j.autcon.2022.104197.

[12] F. Xu, X. Wang, and L. Wang, “Cable inspection robot for cable-stayed bridges: Design, analysis, and application”, Journal of Field Robotics, vol. 28, no. 3, pp. 441-459, 2011, doi: 10.1002/rob.20390.

[13] Z. Wang, B. He, Y. Zhou, et al., “Design and implementation of a cable inspection robot for cable-stayed bridges”, Robotica, vol. 39, no. 8, pp. 1417-1433, 2021, doi: 10.1017/S0263574720001253.

[14] S. Cho, J. Yim, S.W. Shin, et al., “Comparative field study of cable tension measurement for a cable-stayed bridge”, Journal of Bridge Engineering, vol. 18, no. 8, pp. 748-757, 2013, doi: 10.1061/(ASCE)BE.1943-5592.0000421.

[15] J. Zhang and F.T.K. Au, “Calibration of initial cable forces in cable-stayed bridge based on Kriging approach”, Finite Elements in Analysis and Design, vol. 92, pp. 80-92, 2014, doi: 10.1016/j.finel.2014.08.007

Downloads

Published

2025-06-30

How to Cite

Zheng, Xilong. “Parameter Analysis of a Cable-Stayed Bridge Without Backstays”. Archives of Civil Engineering, vol. 71, no. 2, June 2025, pp. 623-40, doi:10.24425/ace.2025.154141.

Issue

Section

Articles

Similar Articles

<< < 27 28 29 30 31 32 33 34 35 36 > >> 

You may also start an advanced similarity search for this article.