Contractor’s risk premium in design & build construction contracts

Authors

DOI:

https://doi.org/10.24425/ace.2025.156171

Abstract

The article is based on data about 349 orders for road construction in Poland. The unit prices (per one kilometer of roads) are compared, arising from the following two types of orders: design-bid-build (DBB) and design & build (D&B). As the exact list of construction works, as well as, the precise number of works is unknown before the contract is signed, the contractor’s risk is higher. The probability of underpricing the offer in the case of D&B orders is higher than that of DBB orders. It is assumed that the contractors, to avoid the potential loss (if the offer is underpriced), raise the value of their offers more than in the case of DBB types of orders. This increase in offer price is usually named risk premium. The averaged unit prices of the roads of the same kind ordered as DBB are compared to D&B orders. To find the risk premium, to the values of DBB orders, the prices of the designs are added. This made the scope of the DBB and D&B orders the same i.e. able to compare. It is discovered that the average unit prices for DBB orders are higher than for D&B orders for four groups of orders, so the risk premium can’t be calculated there. For the other two groups of orders, the risk premium is 19% and 49% of the total value of the DBB order i.e. value of the design plus the value of construction works ordered.

References

[1] J. Kulejewski, Scheduling Methods of Construction Works with Fuzzy Character of Data Considered. Warsaw, Poland: Oficyna Wydawnicza Politechniki Warszawskiej, 2013 (in Polish).

[2] J.C. Teixeira, J. Kulejewski, M. Krzemiński, and J. Zawistowski, Risk Management. Guimaraes, Warsaw, 2011. [Online]. Available: https://www.lex-bud.com.pl/pdfpliki/ryzykobudownictwo.pdf. [Accessed: 18. May, 2024].

[3] A Guilde to the Project Management Body of Knowledge (PMBOK Guide), 5th ed.Warsaw, Poland: Management Training & Development Center Sp. z o.o., 2013 (in Polish).

[4] M.S.B.A.A. El-Karim, O.A.M. El Nawawy, and A.M. Abdel-Alim, “Identification and assessment of risk factors affecting construction projects”, HBRC Journal, vol. 13, no. 2, pp. 202-216, 2015, doi: 10.1016/j.hbrcj.2015.05.001.

[5] F. Al-Sahar, “Methods of Determining Risk List (Identification) and Risk controlling by Lean Tools for Iraqi Construction Projects”, Ph.D. thesis, Warsaw University of Technology, Poland, 2024.

[6] H. Anysz, “The profit as in-company evaluation of the construction site effectiveness”, MATEC Web of Conferences, vol. 117, art. no. 00009, 2017, doi: 10.1051/matecconf/201711700009.

[7] A. Leśniak and F, Janowiec, “Risk Assessment of Additional Works in Railway Construction Investments Using the Bayes Network”, Sustainability, vol. 11, no. 19, 2019, doi: 10.3390/su11195388.

[8] D. Wieczorek, K. Zima, and E. Plebankiewicz, “Expert studies on the impact of risk on the life cycle costs of buildings”, Archives of Civil Engineering, vol. 69, no. 4, pp. 105-123, 2023, doi: 10.24425/ace.2023.147650.

[9] H. Anysz, M. Apollo, and B. Grzyl, “Quantitative Risk Assessment in Construction Disputes Based on Machine Learning Tools”, Symmetry, vol. 13, no. 5, 2021, doi: 10.3390/sym13050744.

[10] H. Anysz, “Managing Delays in Construction Projects Aiming at Cost Overrun Minimization”, IOP Conference Series Materials Science and Engineering, vol. 603, art. no. 032004, 2019, doi: 10.1088/1757-899X/603/3/032004.

[11] M. Górski and D. Skorupka, “Selected methods of identifying risk factors against the background of the project life cycle and the construction investment process”, Zeszyty Naukowe. Akademia Wojsk Lądowych imienia generała Tadeusza Kościuszki, no. 4, pp. 307-324, 2011 (in Polish).

[12] R.M. Johnson and R.I.I. Babu, “Time and cost overruns in the UAE construction industry: a critical analysis”, International Journal of Construction Management, vol. 20, no. 5, pp. 402-411, 2018, doi: 10.1080/15623599.2018.1484864.

[13] I. Mahamid, A. Bruland, and N. Dmaidi, “Causes of Delay in Road Construction Projects”, Journal of Management in Engineering, vol. 28, no. 3, pp. 300-310, 2012, doi: 10.1061/(ASCE)ME.1943-5479.0000096.

[14] A. Leśniak, F. Janowiec, and J.R., Benavides, “The risk of additional branch works in the construction of railway projects”, Archives of Civil Engineering, vol. 70, no. 2, pp. 643-659, 2024, doi: 10.24425/ace.2024.149886.

[15] The FIDIC contract Guide – First Polish Edition. Cracow, Poland: DjaF, 2009 (in Polish).

[16] J. Busaidi, J. Naamani, and A. Mohammadi, “Project Execution Philosophy – Design Build Own Operate & Maintain (BBOOM) Contracting Strategy”, presented at ADIPEC Conference, 2023, doi: 10.2118/216408-MS.

[17] E.M. Sari, A.P. Irawan, M.A.Wibowo, et.al., “Design bid build to integrated project delivery: Strategic formulation to increase partnering”, Journal of Infrastructure, Policy and Development, vol. 8, no. 1, art. no. 2242, 2024, doi: 10.24294/jipd.v8i1.2242.

[18] P. Nowak, et al., Trans European promotion of private public partnership projects. TEP-PPP. Warsaw: DTP and Design, 2012.

[19] E.H.W. Chan and A.T.W. Yu, “Contract strategy for design management in the design and build system”, International Journal of Project Management, vol. 23, no. 8, pp. 630-639, 2005, doi:10.1016/j.ijproman.2005.05.004.

[20] R. Lestari, I. Bali, and J.Widjajakusuma, “The influence of schematic design document on outcome of design and build project of public buildings”, E3S Web of Conferences, vol. 429, 2023, doi: 10.1051/e3sconf/202342901001.

[21] V. Demetracopoulou, W.J. O’Brien, and N. Khwaja, “Influential factors for risk assessment and allocation on complex design-build infrastructure projects; the Texas experience”, Frontiers in Built Environment, vol. 10, art. no. 1330506, 2024, doi:10.3389/fbuil.2024.1330506.

[22] A. Foremny, “Artificial Intelligence methods in detecting bid-rigging in public procurement infrastructure projects”, Ph.D. thesis, Warsaw University of Technology, Poland, 2023.

[23] A. Foremny, M. Oktabiński, and H. Anysz, “Road Construction in Poland”, Mendeley Data, V1, 2024, doi: 10.17632/tmxgwfsz4w.2.

[24] M. Rabiej, Statistics with Statistica Software. Gliwice, Poland: Helion, 2012 (in Polish).

[25] J. Jakubowski, S.M. Kot, and J. Sokołowski, Statistics, 2nd ed. Warsaw, Poland: Difin, 2011 (in Polish).

[26] N. Józefacka, A. Arciszewska-Leszczuk, F.M. Kołek, and P. Iwankowski, Methodology and Statistics. The Guide of Scientific Tourist, vol. 1. Warsaw, Poland: PWN, 2023 (in Polish).

[27] A.D. Aczel, Business Statistics, 2nd ed. Warsaw, Poland: PWN, 2022 (in Polish).

[28] H. Levene, “Robust Tests for Equality of Variances”, in Contributions to Probability and Statistics: Essays in Honor of Harold Hotellin, I. Olkin, et al., Eds. Palo Alto, USA: Stanford University Press, 1960, pp. 278-292.

[29] J.L. Gastwirth, Y.R. Gel, and W. Miao, “The Impact of Levene’s Test of Equality of Variances on Statistical Theory and Practice”, Statistical Sciences, vol. 24, no. 3, pp. 343-360, 2009, doi: 10.1214/09-STS301.

[30] D.W. Nordstokke and B.D. Zumbo, “A Cautionary Tale About Levene’s Tests for Equal Variances”, Journal of Educational Research and Policy Studies, no. 7, pp. 1-14, 2007.

Downloads

Published

2025-12-30

How to Cite

Anysz, Hubert, and Michał Oktabiński. “Contractor’s Risk Premium in Design & Build Construction Contracts”. Archives of Civil Engineering, vol. 71, no. 4, Dec. 2025, pp. 299-13, doi:10.24425/ace.2025.156171.

Issue

Section

Articles

Similar Articles

<< < 11 12 13 14 15 16 17 18 19 20 > >> 

You may also start an advanced similarity search for this article.