Selecting the market for an international construction enterprise

Authors

DOI:

https://doi.org/10.24425/ace.2025.156189

Abstract

The selection of the target market (i.e., country) is a key decision that affects the contractor’s development prospects and determines success or failure in the competitive international construction environment. Despite its importance, the problem of market selection has been the subject of limited research and few tools have been proposed to help reduce the risk of making the wrong choice. Availability of several compromising/conflicting criteria, the difficulty in articulating and capturing them, and the ambiguities that may arise in their interpretation make the market selection for a construction enterprise a complicated task. This paper addresses this research gap and presents a tool based on a modified Fuzzy Group Analytic Hierarchy Process, which employs a type-2 fuzzy envelope of extended hesitant linguistic term set (EHFLTS) to aggregate the decision-maker’s judgments. Using extended hesitant linguistic terms, the comparative linguistic expressions (CLEs) generated using context-free grammar (CFG) enable the decision-maker(s) to express their preferences in a way that resembles a natural language. They also help to capture the hesitation in prioritizing the available options. The process of computing with word (CWW) with CLEs is implemented through EHFLTS envelopes. To illustrate the method’s principles of operation, a hypothetical case of selecting the best market for the construction enterprise is introduced.

References

[1] M. Tomczak and P. Jaśkowski, “Customized particle swarm optimization for harmonizing multi-section construction projects”, Automation in Construction, vol. 162, art. no. 105359, 2024, doi: 10.1016/J.AUTCON.2024.105359.

[2] M. Tomczak and P. Jaśkowski, “Harmonizing construction processes in repetitive construction projects with multiple buildings”, Automation in Construction, vol. 139, 2022, doi: 10.1016/J.AUTCON.2022.104266.

[3] N. Ibadov, S. Farzaliyev, and I. Ladnykh, “Selection of technological and organizational solutions for construction works with the use of a fuzzy relation of preferences”, Archives of Civil Engineering, vol. 69, no. 4, pp. 573-589, 2023, doi: 10.24425/ACE.2023.147677.

[4] E. Kania, G. Śladowski, E. Radziszewska-Zielina, And B. Sroka, “Assessment of the effectiveness of communication between the participants of a construction project utilizing meta-network theory: a case study”, Archives of Civil Engineering, vol. 69, no. 1, pp. 307-327, 2023, doi: 10.24425/ACE.2023.144175.

[5] S.K. Viswanathan and K.N. Jha, “Factors Influencing International Market Selection for Indian Construction Firms”, Journal of Management in Engineering, vol. 35, no. 5, 2019, doi: 10.1061/(ASCE)ME.1943-5479.0000703.

[6] C.M.M. Isa, H.M. Saman, and S.R.M. Nasir, “Specific-factors Influencing Market Selection Decision by Malaysian Construction Firms into International Market”, Procedia – Social and Behavioral Sciences, vol. 129, pp. 4-10, 2014, doi: 10.1016/J.SBSPRO.2014.03.641.

[7] S.K. Viswanathan and K.N. Jha, “Entry Mode Sequencing Model for Emerging International Construction Firms”, Journal of Management in Engineering, vol. 36, no. 3, 2020, doi: 10.1061/(ASCE)ME.1943-5479.0000747.

[8] C. Chen, Q. Wang, I. Martek, and H. Li, “International Market Selection Model for Large Chinese Contractors”, Journal of Construction Engineering and Management, vol. 142, no. 10, 2016, doi: 10.1061/(ASCE)CO.1943-7862.0001122.

[9] Engineering News-Record, “ENR’s 2023 Top 250 International Contractors”, 2023. [Online]. Available: https://www.enr.com/https://www.enr.com/.

[10] L. Li, I. Martek, and C. Chen, “Institutional Factors Impacting on International Construction Market Selection: Evidence from Chinese Contractors”, Buildings, vol. 12, no. 5, 2022, doi: 10.3390/BUILDINGS12050543.

[11] Y.-H. Lin and Z. Su, “International Market Selection of Infrastructure Construction Investment Along ‘One Belt And One Road’: The Case of Asean Countries”, in Proceedings of the 35th Annual ARCOM Conference, 2-4 September 2019, Leeds, UK, C. Gorse and C.J. Neilson, Eds. Association of Researchers in Construction Management, 2019, pp. 782-790.

[12] A. Maqsoom, C. Charoenngam, R. Masood, and M. Awais, “Foreign Market Entry Considerations of Emerging Economy Firms: An Example of Pakistani Contractors”, Procedia Engineering, vol. 77, pp. 222-228, 2014, doi: 10.1016/J.PROENG.2014.07.020.

[13] I. Dikmen and M.T. Birgonul, “Neural Network Model to Support International Market Entry Decisions”, Journal of Construction Engineering and Management, vol. 130, no. 1, pp. 59-66, 2004, doi: 10.1061/(ASCE)0733-9364(2004)130:1(59).

[14] B. Ozorhon, I. Dikmen, and M.T. Birgonul, “Case-Based Reasoning Model for International Market Selection”, Journal of Construction Engineering and Management, vol. 132, no. 9, pp. 940-948, 2006, doi: 10.1061/(ASCE)0733-9364(2006)132:9(940).

[15] P. Brewer, “International market selection: developing a model from Australian case studies”, International Business Review, vol. 10, no. 2, pp. 155-174, 2001, doi: 10.1016/S0969-5931(00)00049-4.

[16] A.J. Koch, “Selecting overseas markets and entry modes: Two decision processes or one?”, Marketing Intelligence & Planning, vol. 19, no. 1, pp. 65-75, 2001, doi: 10.1108/02634500110366120.

[17] S.C. e Silva, R. Meneses, and J. Radomska, “A holistic perspective on the international market selection phenomenon”, Journal of East European Management Studies, vol. 23, no. 4, pp. 579-602, 2018, doi: 10.5771/0949-6181-2018-4-579.

[18] R.A. Aliev, B.G. Guirimov, O.H. Huseynov, and R.R. Aliyev, “Country selection problem for business venturing in Z-information environment”, Information Sciences, vol. 597, pp. 230-243, 2022, doi: 10.1016/j.ins.2022.03.049.

[19] S.H. Zolfani, A.E. Torkayesh, F. Ecer, Z. Turskis, and J. Šaparauskas, “International market selection: A MABA based EDAS analysis framework”, Oeconomia Copernicana, vol. 12, no. 1, pp. 99-124, 2021, doi: 10.24136/oc.2021.005.

[20] O.M. Martín, S. Chetty, and W. Bai, “Foreign market entry knowledge and international performance: The mediating role of international market selection and network capability”, Journal of World Business, vol. 57, no. 2, 2022, doi: 10.1016/j.jwb.2021.101266.

[21] R.C. van Kleef, et al., “Scope and Incentives for Risk Selection in Health Insurance Markets With Regulated Competition: A Conceptual Framework and International Comparison”, Medical Care Research and Review, vol. 81, no. 3, pp. 175-194, 2024, doi: 10.1177/10775587231222584.

[22] M. Yeşilkaya and Y. Çabuk, “A hybrid mathematical model for international target market decision: the case of fibreboard industry”, Wood Material Science & Engineering, vol. 18, no. 6, pp. 2013-2028, 2023, doi: 10.1080/17480272.2023.2212267.

[23] R. González-Márquez, I.M. Rosa-Díaz, F.J. Caro-González, and J.L. Galán-González, “Where to internationalise and why: Country selection by restaurant franchises”, Journal of Retailing and Consumer Services, vol. 72, 2023, doi: 10.1016/j.jretconser.2023.103287.

[24] J.G. Vanegas-López, J.J. Baena-Rojas, D.A. López-Cadavid, and M. Mathew, “International market selection: an application of hybrid multi-criteria decision-making technique in the textile sector”, Review of International Business and Strategy, vol. 31, no. 1, pp. 127-150, 2021, doi: 10.1108/RIBS-07-2020-0088.

[25] E. Oey, Noviyanti, and S. Lim, “Evaluating international market selection with multi-criteria decision making tools – A case study of a metal company in Indonesia”, International Journal of Business Excellence, vol. 16, no. 3, pp. 341-361, 2018, doi: 10.1504/IJBEX.2018.095645.

[26] D. Quer, E. Claver, and R. Andreu, “Foreign market entry mode in the hotel industry: The impact of country- and firm-specific factors”, International Business Review, vol. 16, no. 3, pp. 362-376, 2007, doi: 10.1016/j.ibusrev.2007.01.003.

[27] A. Ojala and P. Tyrväinen, “Market entry and priority of small and medium-sized enterprises in the software industry: An empirical analysis of cultural distance, geographic distance, and market size”, Journal of International Marketing, vol. 15, no. 3, pp. 123-149, 2007, doi: 10.1509/jimk.15.3.123.

[28] O. Selcuk, H. Turkoglu, G. Polat, and M. Hajdu, “An integrative literature review on the causes of delays in construction projects: evidence from developing countries”, International Journal of Construction Management, vol. 24, no. 6, pp. 610-622, 2024, doi: 10.1080/15623599.2022.2135939.

[29] P. Jaśkowski, A. Sobotka, and A. Czarnigowska, “Decision model for planning material supply channels in construction”, Automation in Construction, vol. 90, pp. 235-242, 2018, doi: 10.1016/J.AUTCON.2018.02.026.

[30] M. Tomczak, “Modeling of the harmonization method for executing a multi-unit construction project”, Open Engineering, vol. 9, no. 1, pp. 282-291, 2019, doi: 10.1515/ENG-2019-0036.

[31] D. Wieczorek, K. Zima, E. Plebankiewicz, “Expert studies on the impact of risk on the life cycle costs of buildings”, Archives of Civil Engineering, vol. 69, no. 4, pp. 105-123, 2023, doi: 10.24425/ACE.2023.147650.

[32] M. Bryx, I. Rudzka, and J. Sobieraj, “The housing market in Poland during the Covid-19 pandemic”, Archives of Civil Engineering, vol. 69, no. 4, pp. 393-411, 2023, doi: 10.24425/ACE.2023.147666.

[33] L. Li, C. Chen, I. Martek, and G. Li, “An integrated model for international market and entry mode selections for Chinese contractors”, Engineering, Construction and Architectural Management, vol. 31, no. 6, pp. 2457-2477, 2024, doi: 10.1108/ECAM-12-2021-1090.

[34] Y. Liu, R.M. Rodríguez, J. Qin, and L. Martínez, “Type-2 fuzzy envelope of extended hesitant fuzzy linguistic term set: Application to multi-criteria group decision making”, Computers & Industrial Engineering, vol. 169, 2022, doi: 10.1016/J.CIE.2022.108208.

[35] J.J. Buckley, “Fuzzy hierarchical analysis”, Fuzzy Sets & Systems, vol. 17, no. 3, pp. 233-247, 1985, doi: 10.1016/0165-0114(85)90090-9.

[36] C. Kahraman, B. Öztayşi, I. Uçal Sari, and E. Turanoˇglu, “Fuzzy analytic hierarchy process with interval type-2 fuzzy sets”, Knowledge Based Systems, vol. 59, pp. 48-57, 2014, doi: 10.1016/j.knosys.2014.02.001.

[37] R.M. Rodriguez, L. Martinez, and F. Herrera, “Hesitant fuzzy linguistic term sets for decision making”, IEEE Transactions on Fuzzy Systems, vol. 20, no. 1, pp. 109-119, 2012, doi: 10.1109/TFUZZ.2011.2170076.

[38] D. Filev and R.R. Yager, “On the issue of obtaining OWA operator weights”, Fuzzy Sets & Systems, vol. 94, no. 2, pp. 157-169, 1998, doi: 10.1016/S0165-0114(96)00254-0.

[39] C.Wei, R.M. Rodriguez, and L. Martinez, “Uncertainty measures of extended hesitant fuzzy linguistic term sets”, IEEE Transactions on Fuzzy Systems, vol. 26, no. 3, pp. 1763-1768, 2018, doi: 10.1109/TFUZZ.2017.2724023.

[40] S.Ç. Onar, G. Büyüközkan, B. Öztayşi, and C. Kahraman, “A new hesitant fuzzy QFD approach: An application to computer workstation selection”, Applied Soft Computing, vol. 46, pp. 1-16, 2016, doi: 10.1016/J.ASOC.2016.04.023.

Downloads

Published

2025-12-30

How to Cite

Tomczak, Michał, et al. “Selecting the Market for an International Construction Enterprise”. Archives of Civil Engineering, vol. 71, no. 4, Dec. 2025, pp. 573-85, doi:10.24425/ace.2025.156189.

Issue

Section

Articles

Similar Articles

<< < 7 8 9 10 11 12 13 14 15 16 > >> 

You may also start an advanced similarity search for this article.