[1]
Starczyk-Kołbyk, A. and Kruszka, L. 2021. Use of the EVM method for analysis of extending the construction project duration as a result of realization disturbances - case study. Archives of Civil Engineering. 67, 3 (Sep. 2021), 373–393. DOI:https://doi.org/10.24425/ace.2021.138061.