[1]
Sutikno, S. et al. 2022. Using PLS-SEM to analyze the criteria for the optimum cost of green MICE projects in Indonesia based on value engineering and lifecycle cost analysis. Archives of Civil Engineering. 68, 4 (Dec. 2022), 555–570. DOI:https://doi.org/10.24425/ace.2022.143054.