[1]
Jaśkowski, P. et al. 2025. Reactive scheduling of repetitive construction projects by allocating additional resources. Archives of Civil Engineering. 71, 4 (Dec. 2025), 559–572. DOI:https://doi.org/10.24425/ace.2025.156188.