Starczyk-Kołbyk, A., & Kruszka, L. (2021). Use of the EVM method for analysis of extending the construction project duration as a result of realization disturbances - case study. Archives of Civil Engineering, 67(3), 373–393. https://doi.org/10.24425/ace.2021.138061