Starczyk-Kołbyk, A. and Kruszka, L. (2021) “Use of the EVM method for analysis of extending the construction project duration as a result of realization disturbances - case study”, Archives of Civil Engineering, 67(3), pp. 373–393. doi: 10.24425/ace.2021.138061.