Liu, Meng, et al. “Static and Dynamic Test Analysis of a 12-Years Old 14 000-Ton Cable-Stayed Bridge Used Swivel Construction Technology”. Archives of Civil Engineering, vol. 67, no. 4, Dec. 2021, pp. 369-81, doi:10.24425/ace.2021.138505.