Single-period unit commitment improvement based on optimal power flow with renewable energy sources using a hybrid of whale optimization algorithm and differential evolution
DOI:
https://doi.org/10.24425/aee.2027.8064Abstract
This article proposes a single-period unit commitment enhancement for specified system load to minimize two separate objective functions of economic operations: fuel cost of thermal power generation units and active power losses of transmission based on Optimal Power Flow (OPF) using a hybrid optimization technique of the Whale Optimization Algo-rithm and Differential Evolution (WOA-DE). The proposed algorithm included the renew-able energy resource of wind turbines, considering the wind speed uncertainty with a Weibull distribution model to estimate wind power output. The wind turbines have been installed based on optimal locations using the WOA-DE technique. The control variables of optimal power flow were initially optimized to minimize two separate objective func-tions of fuel cost and active power losses for each one. These control variables are the gen-erator active power except the slack, the generator voltage magnitude, the transformer tap setting, the shunt compensation reactive power and the locations of renewable energy re-sources. OPF output was accessed during each progressive unit shutdown. Integrating re-newable energy improves the flexibility of the unit commitment schedule by decreasing the number of thermal generating units taken offline without compromising system feasibility. The proposed WOA-DE-based framework can support more economical and reliable oper-ation of the power system by improving unit commitment decisions, increasing the instal-lation of the renewable energy sources, and enabling satisfying the operational constraints of the power system. The novelty of the proposed framework lies in integrating Weibull-based wind recourse characterization, optimal wind turbine placement, single-period unit commitment, and optimal power flow within a hybrid WOA-DE optimization framework to assess power system operation before and after renewable energy integration. The pro-posed technique is implemented on the IEEE 30 bus test system.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Archives of Electrical Engineering

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.