Assessment of Production Costs in Toyota Production System Simulation Based on Makespan
DOI:
https://doi.org/10.24425/mper.2025.156146Abstract
This study examines the impact of makespan on production costs by comparing the Toyota Production System through simulations with three scheduling algorithms: the Initial Method, Simulated Annealing (SA), and Tabu Search (TS). This analysis explores the makespan, total production costs, and unit costs across three varying demand levels. Results show that SA and TS achieve a lower makespan than the Initial Method, although their total production costs are slightly higher. However, as demand increases, unit costs decrease in SA and TS, suggesting improved economies of scale with these methods. These findings highlight critical trade-offs between time and cost, emphasizing the importance of aligning scheduling choices with the company’s strategic goals. Additionally, the study addresses managerial aspects such as Break-even analysis, production constraints, and technology investments. Limitations include a restricted demand range and the exclusion of external factors, suggesting areas for further research on production quality in manufacturing.References
Almeida, A., Amanda, Oliveira, A., Junior, C., Pereira, E., Viana, R., & Gallegos, R. (2023). Production Optimization in The Automotive Industry Using Check Sheet to Reduce Unschedule Downtime. MOJ Applied Bionics and Biomechanics, 7(1), 74–167. DOI: 10.15406/mojabb.2023.07.00190
Banks, J., John, S. C., & Nicol, D. M. (2010). DiscreteEvent System Simulation. Upper Saddle River: Prentice Hall.
Belekoukias, Ioannis, Garza-Rayes, J., & Kumar, V. (2014). The Impact of Lean Methods and Tools on The Operational Performance of Manufacturing Organisations. International Journal of Production, 52.
Chase, R., & Jacobs, F. (2021). Operations and Supply Chain Management (16th ed.). New York: McGrawHill Education.
Drury, C. (2018). Management and Cost Accounting (10th ed.). Andover: Cengage Learning.
Heizer, J., Render, B., & Munson, C. (2023). Operations Management: Sustainability and Supply Chain Mangement (14th ed.). Edinburgh: Pearson Education Limited.
Horngren, C., Datar, S., & Rajan, M. (2012). Cost Accounting A Managerial Emphasis (14th ed.). Harlow: Pearson Education.
Hu, Zheyuan, Cheng, Y., Xiong, H., & Zhang, X. (2023). Assembly Makespan Estimation Using Features Extracted by A Topic Model. Knowledge-Based Systems, 276. DOI: 10.1016/j.knosys.2023.110738
Kolberg, D., & Zuhlke, D. (2015). Lean Automation Enabled by Industry 4.0 Technologies. IFAC-PapersOnline, 48(3), 1870–1875. DOI: 10.1016/j.ifacol.2015.06.359
Kumar, Sunil, Dhingra, A., & Singh, B. (2018). Process Improvement Through Lean–Kaizen Using Value Stream Map: A Case Study in India. The International Journal of Advanced Manufacturing Technology, 96(5), 2687–2698. DOI: 10.1007/s00170-018-1684-8
Li, J., Tan, X., & Li, J. (2018). Research on Dynamic Facility Layout Problem of Manufacturing Unit Considering Human Factors. Mathematical Problem in Engineering, 2018(1).
Li, X., Gao, L., & Wen, X. (2013). Application of an Efficient Modified Particle Swarm Optimization Algorithm for Process Planning. International Journal of Advanced Manufacturing Technology, 96(5), 1355-1369. DOI: 10.1007/s00170-012-4572-7
Liker, J. (2004). The Toyota Way: 14 Management Principles from The World’s Greatest Manufacturer. New York: McGraw-Hill.
Mielczarek, K. (2023). Assessment of the Production Process Organization in The Metal Industry-Case Study. System Safety: Human-Technical FacilityEnvironment, 5(1), 75–266. DOI: 10.2478/czoto-2023- 0029
Monden, Y. (2011). TOYOTA Production System an Integrated Approach to Just-in-Time (4th ed.). New York: CRC Press.
Moreira, M., Ritt, M., Costa, A., & Chaves, A. (2012). Simple Heuristics For the Assembly Line Worker Assignment and Balancing Problem. Journal of Heuristics, 18, 505–524. DOI: 10.1007/s10732-012-9195-5
Negahban, Ashkan, & Smith, J. (2014). Simulation for Manufacturing System Design and Operation: Literature Review and Analysis. Journal of Manufacturing System, 33(2), 241–261. DOI: 10.1016/j.jmsy.2013.12.007
Neuckamp, Sandra, Frantz, R., Roos-Frantz, F., & Sawicki, S. (2022). A Mathematical Model to Compute Makespan for Application Integration Processes Using Graph Theory Approach. International Journal of Computer Applications in Technology, 69(3), 193–205. DOI: 10.1504/IJCAT.2022.127819
Omogbai, Oleghe, & Salonitis, K. (2016). Manufacturing System Lean Improvement Design Using Discrete Event Simulation. Procedia CIRP, 57, 195–200. DOI: 10.1016/j.procir.2016.11.034
Ohno, T. (1998). Toyota Production System. Productivity Press: New York.
Öztop , H., Tasgetiren, M., Eliiyi, D., & Pan, Q.-k. (2019). Metaheuristic Algorithms For the Hybrid Flowshop Scheduling Problem. Computer & Operation Research, 111, 177–196. DOI: 10.1016/j.cor.2019.06.009
Pindyck, R., & Rubinfeld, D. (2020). Microeconomics (9th ed.). Barkeley: Pearson.
Pinedo, M. (2022). Flow Shops and Flexible Flow Shops (deterministic). In M. L. Pinedo, Scheduling (pp. 153-186). Cham: Springer International Publishing. DOI: 10.1007/978-3-031-05921-6
Porter, M. (2008). Competitive Strategy: Techniques for Analyzing Industries and Competitors. New York: Simon adn Schuster.
Rother, M., Shook, J., Womack, J., & Jones. (2003). Learning to See: Value Stream Mapping to Add Value and Eliminate (1st ed.). Boston: Learn Enterprise Institute.
Schindlerova, Vladimira, Sajdlerova, I., Bucko, M., & Klepkova, L. (2023). Simulation and Optimisation of The Assembly Line Production Process. MM Science Journal, 6407–6412. DOI: 10.17973/MMSJ.2023_03_2022104
Shi, J., Zhang, G., & Sha, J. (2011). Optimal Production Planning For a Multi-Product Closed Loop System with Uncertain Demand adn Return. Computers & Operations Research, 38(3), 641–650. DOI: 10.1016/j.cor.2010.08.008
Skėrė, S., Zvironiene, A., Juzenas, K., & Petraitiene, S. (2023). Optimization Experiment of Production Processes Using a Dynamic Decision Support Method: A Solution to Complex Problems in Industrial Manufacturing for Small and Medium-Sized Enterprises. Sensors, 23(9). DOI: 10.3390/s23094498
Slack, N., Brandon-Jones, A., & Johnston, R. (2013). Operation Management (7th ed.). Upper Saddle River: Pearson Education.
Su, Ho, C., & Wang, J. (2022). A Makespan Minimization Problem for Versatile Developers in The Game Industry. RAIRO-Operations Research, 56(6), 3895–3913. DOI: 10.1051/ro/2022191
Toyota. (2018). Modul Sistem Produksi Toyota Production. Jakarta: Toyota Indonesia.
Vargas, Laport, G., & Cunha, A. (2022). Makespan Reduction for Time-Weighted Systems Using a Clonal Selection Algorithm. IEEE 27th International Conference on Emerging Technologies and Factory Automation (ETFA), (pp. 1–8). Stuttgart.
Xu, L., Xu, E., & Li, L. (2018). Industry 4.0: State of The Art and Future Trends. International Journal of Production Research, 56(8), 2941–2962. DOI: 10.1080/00207543.2018.1444806
Zahraee, S., Hashemi, A., Abdi, A., & Shahpanah, A. (2014). Lean Manufacturing Implementation Through Value Stream Mapping: A Case Study. Jurnal Teknologi, 68(3), 119–124. DOI: 10.11113/jt.v68.2957