Optimal Operator Assignment and Cell Loading in Labor-Intensive Manufacturing Systems with Inter-Cell Operator Sharing
DOI:
https://doi.org/10.24425/mper.2025.157216Abstract
This research deals with an operator assignment and cell loading problem in multi-cell production systems with inter-cell operator sharing. A two-phase methodology is proposed to minimize the total manpower requirement. In the first phase, manpower configurations for all products with all levels of manpower available will be generated taking inter-cell operator sharing into consideration. The second phase optimizes the cell loading and selects the manpower configuration for all cells when given a product mix. In order to further reduce manpower requirements, lot-splitting is considered. For both phases, the corresponding mathematical models, which can be optimized by commercial software, LINGO 17, are developed. A case study of a jewelry manufacturing company proposed taken from the literature is adopted to test the proposed methodology. The results show the strategy of inter-cell operator sharing can save 11.56% manpower at most. Moreover, if lot-splitting is considered, at most 14.66% of manpower can be saved.References
Azadeh, A., Nazari-Shirkouhi, S., Hatami-Shirkouhi, L. and Ansarinejad, A., (2011). A unique fuzzy multicriteria decision making: computer simulation approach for productive operators’ assignment in cellular manufacturing systems with uncertainty and vagueness. The International Journal of Advanced Manufacturing Technology, 56, 329–343.
Bagheri, M. and Bashiri, M., (2014). A new mathematical model towards the integration of cell formation with operator assignment and inter-cell layout problems in a dynamic environment. Applied Mathematical Modelling, 38, 1237–1254.
Egilmez, G., Erenay, B. and Süer, G.A., (2014). Stochastic skill-based manpower allocation in a cellular manufacturing system. Journal of Manufacturing Systems, 33, 578–588.
Goli, A., (2024). Efficient optimization of robust project scheduling for industry 4.0: A hybrid approach based on machine learning and meta-heuristic algorithms. International Journal of Production Economics, 278, 109427.
Koltai, T., Dimeny, I., Gallina, V., Gaal, A. and Sepe, C., (2021). An analysis of task assignment and cycle times when robots are added to human-operated assembly lines, using mathematical programming models. International Journal of Production Economics, 242, 108292.
Kuo, Y., Chen, Y.P. and Wang, Y.C., (2018). Operator assignment with cell loading and product sequencing in labour-intensive assembly cells – a case study of a bicycle assembly company. International Journal of Production Research, 56 (13). 5495–5510.
Kuo, Y. and Liu, C.C., (2017). Operator assignment in a labor-intensive manufacturing cell considering intercell manpower transfer. Computers and Industrial Engineering, 110, 83–91.
Kuo, Y. and Yang, T., (2007). Optimization of mixed-skill multi-line operator allocation problem. Computers and Industrial Engineering, 53 (5). 386–393.
Kuo, Y. and Yang, T., (2006). A case study on the operator allocation decision for TFT-LCD inspection and packaging process. Journal of Manufacturing Technology Management, 17 (2). 363–375.
Mehdizadeh, E. and Rahimi, E., (2016). An integrated mathematical model for solving dynamic cell formation problem considering operator assignment and inter/intra cell layouts. Applied Soft Computing, 42, 325–341.
Süer, G.A., (1996). Optimal operator assignment and cell loading in labor intensive manufacturing cells. Computers and Industrial Engineering, 31 (1/2). 155-158.
Süer, G.A. and Bera, I.S., (1998). Optimal operator assignment and cell loading when lot splitting is allowed. Computers and Industrial Engineering, 35 (3–4). 431-434.
Süer, G.A. and Cosner, J. and Patten, A., (2009). Models for cell loading and product sequencing in laborintensive cells. Computers and Industrial Engineering, 56, 97–105.
Süer, G.A. and Dagli, C., (2005). Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells. Computers and Industrial Engineering, 48, 643–655.
Süer, G.A., Kamat, K. Mese, E. and Huang, J., (2013). Minimizing total tardiness subject to manpower restruiction in labor-intensive manufacturing cells. Mathematical and Computer Modelling, 57, 741–753.
Süer, G.A. and Tummaluri, R.R., (2008). Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells. International Journal of Production Research, 46 (1). 469–493.
Yu, Y., Tang, J., Sun, W., Ying, Y. and Kaku, I, (2013). Reducing worker(s) by converting assembly line into a pure cell system. International Journal of Production Economics, 145, 799–806.
Zhang, Z. Tang, Q.H., Ruiz, R. and Zhang, L.P., (2020). Ergonomic risk and cycle time minimization for the U-shaped worker assignment assembly line balancing problem: A multi-objective approach. Computers and Operations Research, 118, 104905.