[1]
Matuszny, M. 2022. Scheduling of the Manufacturing Cell Work with the Use of a Genetic Algorithm on the Example of a Flexible Production System. Management and Production Engineering Review. 13, 4 (Dec. 2022), 98–106. DOI:https://doi.org/10.24425/mper.2022.142398.