[1]
Mousavi, S.M. and Shahnazari-Shahrezaei, P. 2023. Minimizing the Makespan and Total Tardiness in Hybrid Flow Shop Scheduling with Sequence-Dependent Setup Times. Management and Production Engineering Review. 14, 1 (Mar. 2023), 13–24. DOI:https://doi.org/10.24425/mper.2023.145362.