Matuszny, M. (2022). Scheduling of the Manufacturing Cell Work with the Use of a Genetic Algorithm on the Example of a Flexible Production System. Management and Production Engineering Review, 13(4), 98–106. https://doi.org/10.24425/mper.2022.142398