Mousavi, S. M., & Shahnazari-Shahrezaei, P. (2023). Minimizing the Makespan and Total Tardiness in Hybrid Flow Shop Scheduling with Sequence-Dependent Setup Times. Management and Production Engineering Review, 14(1), 13–24. https://doi.org/10.24425/mper.2023.145362