Mousavi, Seyyed Mostafa, and Parisa Shahnazari-Shahrezaei. 2023. “Minimizing the Makespan and Total Tardiness in Hybrid Flow Shop Scheduling With Sequence-Dependent Setup Times”. Management and Production Engineering Review 14 (1):13-24. https://doi.org/10.24425/mper.2023.145362.