Matuszny, M. (2022) “Scheduling of the Manufacturing Cell Work with the Use of a Genetic Algorithm on the Example of a Flexible Production System”, Management and Production Engineering Review, 13(4), pp. 98–106. doi: 10.24425/mper.2022.142398.