Mousavi, S. M. and Shahnazari-Shahrezaei, P. (2023) “Minimizing the Makespan and Total Tardiness in Hybrid Flow Shop Scheduling with Sequence-Dependent Setup Times”, Management and Production Engineering Review, 14(1), pp. 13–24. doi: 10.24425/mper.2023.145362.