Sadiqi, Assia, et al. “A Genetic Algorithm and B&Amp;B Algorithm for Integrated Production Scheduling, Preventiveand Corrective Maintenance to Save Energy”. Management and Production Engineering Review, vol. 11, no. 4, Dec. 2020, pp. 138-4, doi:10.24425/mper.2020.136128.