Matuszny, Marcin. “Scheduling of the Manufacturing Cell Work With the Use of a Genetic Algorithm on the Example of a Flexible Production System”. Management and Production Engineering Review 13, no. 4 (December 30, 2022): 98–106. Accessed September 20, 2026. https://wydawnictwo.pan.pl/index.php/mper/article/view/5493.